Millwoods Sewer Upgrade Phase I
Date
Client
TBDMaterial
450mm Concrete Pipe 600mm Concrete PipeLocation
Edmonton, AlbertaCrossing
Road CrossingsGeotechnical Condition
Clay TillDate
Client
TBDMaterial
450mm Concrete Pipe 600mm Concrete PipeLocation
Edmonton, AlbertaCrossing
Road CrossingsGeotechnical Condition
Clay TillThis Microtunnel work consisted of the installation of approximately 550 meters (1805 ft.) of 450mm and 600mm concrete sewer pipe through residential subdivisions and beneath arterial roadways at depths up to 12 meters (40 ft.). The longest drive completed was approximately 110 meters (360 ft.) in predominantly clay till soil conditions. The total duration of the projects was 3 months.