Heritage Valley Subdivision

Date

2012/09

Client

TBD

Material

1350mm Concrete Pipe 400mm, 500mm, 600mm, 1200mm Steel Casings

Location

Edmonton

Crossing

Road Crossings Pipeline right-of-way Crossings Power Transmission right-of-way Crossings

Geotechnical Condition

Various

The broad scope of work on this project consisted of a 1350mm Pipe Jack and conventional case boring 400mm, 500mm, 600mm, 1200mm steel casing for waterline, sanitary sewers, and storm sewers.  These included various road, pipeline right-of-way crossings, and power transmission right-of-way crossings.  All work was completed in 2002.