Edmonton International Airport Civil Utilities Phase I
Date
Client
Edmonton International AirportMaterial
1800mm Reinforced Concrete PipeLocation
Edmonton, AlbertaCrossing
Taxiway RunwayGeotechnical Condition
Clay TillDate
Client
Edmonton International AirportMaterial
1800mm Reinforced Concrete PipeLocation
Edmonton, AlbertaCrossing
Taxiway RunwayGeotechnical Condition
Clay TillThe work, undertaken as a subcontractor to Raywalt Construction, consisted of installation of approximately 220 meters (700 ft.) of 1800mm reinforced concrete pipe beneath Taxiway Alpha and Runway 12-30 at the Edmonton International Airport. This project was particularly challenging as all typical airport activities remained operational during operations which lasted approximately six weeks.